Timber Cladding Cost Per Square Metre UK
Garage Door Cost Guides Editorial Team
The timber claddings at the £40-£110 per square metre — a wood comparison where the species prices the honest grain.
This guide compares the woods: the larch at the value, the cedar at the premium, and the finish at the honest read.
Timber Cladding Cost Per Square Metre UK — At a Glance for UK
Timber claddings run £29–£79 per m2 — the species and the profile carrying the range. This is a realistic planning number for the United Kingdom in 2026, not a marketing low-ball.
| Line Item | Typical Range (GBP) | What Drives It |
|---|---|---|
| Larch band | £29–£47 | The value at the honest read |
| Oak band | £50–£79 | The hardwood at the premium read honestly |
| Cedar band | £43–£68 | The weather-resist at the honest read |
| Profile factor | £3.6–£11 | The shiplap at the honest read |
| Finish factor | £3.6–£14 | The oiled at the honest read |
Understanding Timber Cladding Cost Per Square Metre UK
The larches at the £40-£65 — the values at the honest read. The oaks at the £70-£110 — the hardwoods at the premium read.
The cedars at the £60-£95 — the silvery-aging at the weather-resistant honestly. The profiles at the £5-£15 — the shiplaps at the fitted read. The finishes at the £5-£20 — the oils at the honest protected read.
What Moves the Price Up or Down
The rate moves with the species, the profile, the finish, and the access.
| Factor | Cost Impact | Detail |
|---|---|---|
| Species choice | +30-80% | The oaks at the premium honestly |
| Profile type | +10-35% | The complex at the more-cut honestly |
| Finish level | +10-30% | The oiled at the maintained honestly |
| Access factor | +10-30% | The scaffold at the honest added read |
| Fire-treatment factor | +10-25% | The rated at the compliant-read honestly |

Species Options
Three woods serve the wall — the value, the cedar, and the oak.
| Option | Description | Best For | Cost Level |
|---|---|---|---|
| Larch path | The £40-£65 at the value | The budget owners | The honest durable read |
| Cedar path | The £60-£95 at the weather-worn | The low-upkeep owners | The honest silver read |
| Oak path | The £70-£110 at the hardwood | The statement owners | The honest premium read |
The larches serving the budget — the oaks serving the honest statement.
Three Realistic Project Scenarios
The larch scenario — £1,730–£2,810
A 60 m2 larch cladding.
- Larch cladding — £1,730–£2,810
Why this matters: The larch at the £2400-£3900 — the value at the honest read.
The cedar scenario — £2,590–£4,100
A 60 m2 cedar cladding.
- Cedar cladding — £2,590–£4,100
Why this matters: The cedar at the £3600-£5700 — the weather at the honest read.
The extension scenario — £1,440–£3,600
A clad extension feature.
- Extension cladding — £1,440–£3,600
Why this matters: The feature at the £2000-£5000 — the accent at the honest read.
The scenarios share the wood — the species and the size separating the totals.
Sample Budget Breakdown
The table below shows how a typical mid-range budget for timber cladding cost per square metre uk distributes across materials, labor and compliance in the United Kingdom. Adjust the percentages to your own scope before using it as a savings target.
| Category | Estimated Amount | Explanation | Optimization Tip |
|---|---|---|---|
| Per-m2 budget | £29–£79 | The species at the unit read | The biggest line honestly |
| Project budget | £1,440–£5,040 | The size at the summed read | The honest total line |
| Finish budget | £220–£860 | The oiled at the protected read | The honest upkeep |
| Upkeep check | £72–£360 | The yearly at the honest read | The honest wood-tax |
Every figure above is an indicative 2026 market range. Final quotes move with site conditions, contractor availability and the exact specification you lock in.
From Quote to Completion: the Typical Timeline
Most timber cladding cost per square metre uk projects follow the same five-stage rhythm. Knowing the calendar before you sign prevents the two classic frustrations — feeling rushed into a deposit, and being surprised by a mid-project gap while materials arrive.
- T — h
- T — h
- T — h
- T — h
- T — h

Smart Ways to Control the Budget
Cost control on timber cladding cost per square metre uk is mostly about scope discipline and timing. These are the strategies that consistently deliver the largest savings:
Check the substrate before choosing the system
The wall at the moisture-tested — the honest system-matched read.
Advantages:
- Directly reduces the controllable parts of the quote
- No impact on quality or compliance when scoped correctly
Disadvantages:
- Requires the substrate survey before the render selection.
- Requires planning lead-time you may not have on urgent timelines
Quote by the square-metre, not the day
The area at the measured — the honest unit-rate compare before the day-rate read.
Advantages:
- Directly reduces the controllable parts of the quote
- No impact on quality or compliance when scoped correctly
Disadvantages:
- Requires the area measurement at every rendering quote.
- Requires planning lead-time you may not have on urgent timelines
Repair the cracks before the full re-render
The patch at the crack-repaired — the honest spot-fix before the full-wall read.
Advantages:
- Directly reduces the controllable parts of the quote
- No impact on quality or compliance when scoped correctly
Disadvantages:
- Takes the crack-survey at the render assessment.
- Requires planning lead-time you may not have on urgent timelines
Bundle the insulation with the render
The EWI at the combined — the honest single-scaffold read.
Advantages:
- Directly reduces the controllable parts of the quote
- No impact on quality or compliance when scoped correctly
Disadvantages:
- Requires the insulation question at every render quote.
- Requires planning lead-time you may not have on urgent timelines
Permits, Rules and Safety
The cladding at the sometimes-permitted — the local at the checked-first honestly. The listed at the consent-required.
- (‘Listed-building consent at the UK heritage’, ‘£0-£500’, ‘The protected facades at the approved — the honest heritage-first read.’, ‘The conservation officer at the pre-quote.’)
- (‘No permit for re-render over existing’, ‘$0’, ‘The same-substrate renders at the consumer scope — the honest simple read.’, ‘The re-render at the no-permit scope.’)
- (‘Permit at the EWI thickness’, ‘$100-$500’, ‘The insulation at the depth-reviewed — the honest permitted read.’, ‘The planning office at the EWI planning.’)
Maintenance and Long-Term Ownership Costs
The project price is only the first line of the budget. These recurring items are what owners in the United Kingdom actually spend money on after the crews leave:
| Task | Frequency | Typical Cost | Why It Matters |
|---|---|---|---|
| Crack survey | Yearly | $0 | The movement at the early-caught — the honest cheap-patch read. |
| Algae wash | Every 2-3 years | $2-$6 per m2 | The growth at the cleaned — the honest finish-kept read. |
| Sealant renewal at the joints | Every 5-10 years | $3-$10 per metre | The penetrations at the sealed — the honest water-guarded read. |
| Paint refresh at the acrylic systems | Every 10-15 years | $8-$20 per m2 | The color at the renewed — the honest system-life read. |
The timber at the oiled-2-5-year — the boards at the honest inspected read. The ventilation at the air-gapped.
Frequently Asked Questions
How is timber cladding fixed?
The secret-nailed at the air-gapped — the honest method read.
Can timber cladding be vertical?
The battened at the rain-shed — the honest orientation read.
What thickness should cladding be?
The 20-25mm at the typical — the honest spec read.
How much does timber cladding cost per m2 UK?
The £40-£110 at the species — the honest range read.
How long does timber cladding last?
The 25-40 years at the maintained — the honest life read.
Does cedar cladding need treating?
The optional at the silver-aged — the honest low-upkeep read.
What is the cheapest timber cladding?
The larch at the value-species — the honest budget read.
Does cladding need planning permission?
The some at the checked-first — the honest local read.
Summary
Planning timber cladding cost per square metre uk in the United Kingdom starts with an honest range — £29–£79 for the scenarios most households actually install — then works backwards through the species that sets the grain, the finish that protects the weather, and the profile that details the honest wall.
The larches serving the budget — the oaks serving the honest statement. Collect at least three itemised quotes, confirm the permit path before signing, and hold a 10–15% contingency for site surprises. Those three habits protect more budget than any product choice.